Performance bond cost: federal penal sums and your premium

Which bonds FAR Part 28 requires for your contract price, for how much,

and what your surety's own rate schedule makes the premium.

Source: FAR 28.102-1 General. (48 CFR) (eCFR, current as of 2026-11-10)

$450,000.00performance bond on a $450,000 federal contract
$450,000.00payment bond: 100% of the price too

Over $150,000, FAR 28.102 requires a performance bond and a payment bond,

each normally 100% of the original contract price.

What they cost is the premium, a price your surety quotes; there is no official rate, so we don't publish one.

Type your quote's rate schedule below and each tier is multiplied out.

A contract officer and a general contractor review a thick construction contract and a sealed bond document at a meeting table on a snowy winter day.
Your surety's rate schedule No default rate: check Treasury's Circular 570 list or your surety. A flat rate is one tier with no upper limit.

How the numbers are figured

  1. Which bondsOver $150,000: performance and payment bonds. Over $35,000 up to $150,000: payment protection only. $35,000 or less: none (the solicitation may still ask for other security).
  2. Penal sumEach required bond equals 100% of the original contract price, and grows by 100% of any increase.
  3. PremiumYour quote's tiers, each slice × its rate on screen. The exact amounts are added and rounded once, half-up to the cent (rounding).
  4. No default rateThere is no official premium rate. Your surety sets it; Treasury's Circular 570 lists the sureties accepted on federal bonds.

“requires performance and payment bonds for any construction contract exceeding $150,000”

FAR 28.102-1 General. (48 CFR) · eCFR, current as of 2026-11-10

“100 percent of the original contract price”

FAR 28.102-2 Amount required. (48 CFR) · eCFR, current as of 2026-11-10

“Original contract price does not include the price of any options,

except those options exercised at the time of contract award.”

FAR 28.102-2 Amount required. (48 CFR) · eCFR, current as of 2026-11-10

What this tool does not do

Limits — not legal or insurance advice. We don't publish or suggest a premium rate: your surety sets it based on your company, the job and the market. This applies FAR Part 28 to federal construction contracts. State and local bond laws, bonds on non-construction contracts, bid bond pricing and surety qualification are not covered. For the bid guarantee, see the bid bond guide; to put the premium into the bid, use the bid cost calculator.